The Energy Mix
Subscribe
Donate
  • Topics
    • Buildings & Infrastructure
    • Climate Equity & Justice
      • Energy Poverty
      • Indigenous Rights & Reconciliation
    • Climate Finance
      • Community Climate Finance
      • Finance & Investment
      • Insurance & Liability
      • Subsidies
    • Climate Impacts & Adaptation
      • Biodiversity & Habitat
      • Drought & Wildfires
      • Forests & Deforestation
      • Health & Safety
      • Heat & Temperature
      • Ice Loss & Sea Level Rise
      • Severe Storms & Flooding
    • Emissions
      • Carbon Levels & Measurement
      • CCS & Negative Emissions
      • Methane
    • Energy
      • Renewables
      • Fossil Fuels
      • Hydrogen
      • Nuclear
      • Batteries & Storage
      • Energy Efficiency
      • Power Grids
    • Food & Agriculture
    • Industry
      • Data Centres & Tech
      • Critical Minerals & Mining
      • Petrochemicals & Plastics
    • Policy & Politics
      • Carbon Pricing
      • COP Conferences
      • Elections
      • Energy Politics
      • International Security & War
      • Legal & Regulatory
    • Research & Innovation
      • International Agencies & Studies
      • Research & Development
    • Society & Culture
      • Climate Action
      • Mis/Disinformation & Greenwashing
      • Jobs & Training
      • Leisure & Recreation
      • Media, Messaging, & Public Opinion
    • Transportation & Mobility
      • Electric Vehicles
      • Shipping & Aviation
      • Transit
      • Walking, Biking & Micromobility
  • Regions
    • Africa
    • Arctic & Antarctica
    • Asia
    • Australia
    • Canada
    • International
    • Mexico & the Caribbean
    • Middle East
    • Oceans
    • Small Island States
    • South & Central America
    • Subnational
    • United States
    • UK & Europe
  • Special Coverage
    • The Weekender
    • IEA2026
    • Canada’s Major Projects Office
    • Hidden Wonder Valley
    • COP30
    • Cities & Communities
    • Heat & Power
    • Community Climate Finance
  • More Resources
    • Climate Glossary
    • What If We Changed the Conversation on Climate Change?
    • Eco-Anxiety
  • About
  • Contact
No Result
View All Result
The Energy Mix
  • Topics
    • Buildings & Infrastructure
    • Climate Equity & Justice
      • Energy Poverty
      • Indigenous Rights & Reconciliation
    • Climate Finance
      • Community Climate Finance
      • Finance & Investment
      • Insurance & Liability
      • Subsidies
    • Climate Impacts & Adaptation
      • Biodiversity & Habitat
      • Drought & Wildfires
      • Forests & Deforestation
      • Health & Safety
      • Heat & Temperature
      • Ice Loss & Sea Level Rise
      • Severe Storms & Flooding
    • Emissions
      • Carbon Levels & Measurement
      • CCS & Negative Emissions
      • Methane
    • Energy
      • Renewables
      • Fossil Fuels
      • Hydrogen
      • Nuclear
      • Batteries & Storage
      • Energy Efficiency
      • Power Grids
    • Food & Agriculture
    • Industry
      • Data Centres & Tech
      • Critical Minerals & Mining
      • Petrochemicals & Plastics
    • Policy & Politics
      • Carbon Pricing
      • COP Conferences
      • Elections
      • Energy Politics
      • International Security & War
      • Legal & Regulatory
    • Research & Innovation
      • International Agencies & Studies
      • Research & Development
    • Society & Culture
      • Climate Action
      • Mis/Disinformation & Greenwashing
      • Jobs & Training
      • Leisure & Recreation
      • Media, Messaging, & Public Opinion
    • Transportation & Mobility
      • Electric Vehicles
      • Shipping & Aviation
      • Transit
      • Walking, Biking & Micromobility
  • Regions
    • Africa
    • Arctic & Antarctica
    • Asia
    • Australia
    • Canada
    • International
    • Mexico & the Caribbean
    • Middle East
    • Oceans
    • Small Island States
    • South & Central America
    • Subnational
    • United States
    • UK & Europe
  • Special Coverage
    • The Weekender
    • IEA2026
    • Canada’s Major Projects Office
    • Hidden Wonder Valley
    • COP30
    • Cities & Communities
    • Heat & Power
    • Community Climate Finance
  • More Resources
    • Climate Glossary
    • What If We Changed the Conversation on Climate Change?
    • Eco-Anxiety
  • About
  • Contact
Subscribe
Donate
The Energy Mix
Subscribe

Risks, Uncertainty Cloud Future of Ksi Lisims LNG Facility: IEEFA

June 12, 2025
Reading time: 4 minutes
Full Story: The Energy Mix
Chris Bonasia

Wikipedia

Wikipedia

This story has been updated. It previously stated incorrectly that Ksi Lisims is Indigenous-owned. The project is in fact a wholly-owned subsidiary of Texas-based Western LNG.

The Ksi Lisims liquefied natural gas (LNG) project in British Columbia faces major local risks and global market uncertainty that could derail its success, a new report warns.

With these challenges factored into financial projections, it is “highly unlikely” that the floating gas liquefaction and export terminal can be delivered on budget, the Institute for Energy Economics and Financial Analysis (IEEFA) writes in the report.

Planned for B.C’s northern coast, Ksi Lisims would export 12 million tonnes of liquified natural gas per year, supplied by the approved—but not yet built—Prince Rupert Gas Transmission (PRGT) pipeline. Though frequently referred to as ‘Indigenous-owned’—including by B.C. Premier David Eby—Ksi Lisims Tolling LP is actually one of two “wholly-owned subsidiaries of Western LNG LLC” formed in 2021 for the project, states an overview submitted to B.C.’s environmental assessment office. The facility is sited on Nisga’a First Nation lands—and Western LNG says the project is being co-developed with the Nisga’a government and Rockies LNG.

Nisga’a First Nation co-owns the PRGT pipeline with Western LNG after ownership was transferred from TC Energy in 2024.

Get the latest climate news and analysis, direct to your inbox.

Subscribe Today

View our latest digests

But Ksi Lisims—which is undergoing environmental assessments and seeking regulatory approvals ahead of a final investment decision—faces basic structural hurdles, including challenges to the gas pipeline it depends on. Last November, Gitanyow Hereditary Chiefs declared plans for an Indigenous Protected and Conserved Area (IPCA) to block the PGRT pipeline’s route over environmental concerns. The pipeline also crosses rugged terrain and sensitive marine areas, adding engineering and regulatory hurdles, says IEEFA.

Challenges like these significantly affect Ksi Lisims’ financial prospects, suggests IEEFA’s analysis.

The project’s dependence on the PRGT pipeline for feed gas is a key risk, the report states. B.C. has just recently confirmed that the pipeline permit is viable after it expired last November, but some First Nations have legally challenged it, alleging inadequate consultation and environmental review. Protests led by the Gitananyow Hereditary Chiefs could add costs, as with past megaprojects like the Coastal GasLink pipeline, writes IEEFA.

Ksi Lisims’ developers say they will reduce emissions by powering the facility with renewable hydropower from the B.C. grid, and are targeting net-zero operations. But IEEFA cites uncertainty about securing BC Hydro’s electricity supply as another layer of risk, imperilling the facility’s net-zero ambitions and thus its regulatory compliance.

“Without hydroelectricity, Ksi Lisims LNG will have to rely on gas-powered turbines which increase project capital costs by approximately C$2 billion,” adds IEEFA. The project partners have yet to finalize an agreement with BC Hydro to connect the facility to the North Coast Transmission Line. Meanwhile, other upcoming LNG projects in the province are competing for the same grid capacity.

Net revenue is also questionable given the lack of LNG takers, IEEFA writes, estimating that about 70% of planned production has no dedicated buyer. The twin floating LNG barges planned for the terminal face higher operating costs in harsh marine environments, are largely “unproven in Canadian waters,”  and will provide few local jobs.

And by the time Ksi Lisims would start supplying LNG—its targeted completion date is in 2029—many similar projects are due to come online across the world, creating a global glut, IEEFA writes.

This oversupply could align with weakening demand—as expanding clean energy capacity and tighter emissions regulations lead to structural declines in LNG use.

Evolving domestic markets could also undermine success, as competition for gas as a feedstock within Canada limits the volumes available for export.

“While project developers praise its potential economic benefits, the viability of the Ksi Lisims project depends on its ability to overcome cost pressures, secure firm purchase commitments, and navigate a highly competitive global LNG market amid uncertainties about demand trends,” writes IEEFA.

“At this point, both the project and Canada’s broader LNG ambitions remain vulnerable to formidable headwinds.”







in Energy Politics, Finance & Investment, Fracking & LNG, Heat & Power, Indigenous Rights & Reconciliation, Legal & Regulatory, Power Grids

Trending Stories

Alberta Premier Danielle Smith and Minister of Technology and Innovation Nate Glubish introduced, at a news conference in Edmonton on December 4, 2024, the province’s new data strategy. (photography by Chris Schwarz/Government of Alberta)
Data Centres & Tech

Smith Tells Albertans to ‘Lock In’ Power Prices Before Meta Data Centre Joins Grid

September 1, 2026
42.2k
Jay Phagan/flickr
Pipelines / Rail Transport

West Coast Pipeline Won’t Recoup Its $43.7B Cost as Global Oil Demand Weakens

September 2, 2026
2.2k
Smoke from the Long Lake wildfires in Nova Scotia, August 24, 2025. (A Disappearing Act/flickr)
Heat & Temperature

What a Supercharged El Niño Could Mean for Canada

May 18, 2026
2.3k

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

I agree to the Terms & Conditions and Privacy Policy.

Get the latest climate news and analysis, direct to your inbox.

Subscribe Today

Related Articles

Local Economies Pushed Aside as Newfoundland LNG Megaproject Presses Ahead

Local Economies Pushed Aside as Newfoundland LNG Megaproject Presses Ahead

February 6, 2026
Fermeuse LNG Receives Boost in MOU with South Korea’s Hanwha Industrial Conglomerate

Fermeuse LNG Receives Boost in MOU with South Korea’s Hanwha Industrial Conglomerate

January 29, 2026
LNG Glut Hits on Schedule as Shell, Mitsubishi Try to Withdraw from B.C. Megaproject

LNG Glut Hits on Schedule as Shell, Mitsubishi Try to Withdraw from B.C. Megaproject

January 19, 2026

A Stirring Call to Apathy

by Mitchell Beer
September 6, 2026

…

Follow Us

Risks, Uncertainty Cloud Future of Ksi Lisims LNG Facility: IEEFA

June 12, 2025
Reading time: 4 minutes
Full Story: The Energy Mix
Chris Bonasia

Wikipedia

Wikipedia

This story has been updated. It previously stated incorrectly that Ksi Lisims is Indigenous-owned. The project is in fact a wholly-owned subsidiary of Texas-based Western LNG.

The Ksi Lisims liquefied natural gas (LNG) project in British Columbia faces major local risks and global market uncertainty that could derail its success, a new report warns.

With these challenges factored into financial projections, it is “highly unlikely” that the floating gas liquefaction and export terminal can be delivered on budget, the Institute for Energy Economics and Financial Analysis (IEEFA) writes in the report.

Planned for B.C’s northern coast, Ksi Lisims would export 12 million tonnes of liquified natural gas per year, supplied by the approved—but not yet built—Prince Rupert Gas Transmission (PRGT) pipeline. Though frequently referred to as ‘Indigenous-owned’—including by B.C. Premier David Eby—Ksi Lisims Tolling LP is actually one of two “wholly-owned subsidiaries of Western LNG LLC” formed in 2021 for the project, states an overview submitted to B.C.’s environmental assessment office. The facility is sited on Nisga’a First Nation lands—and Western LNG says the project is being co-developed with the Nisga’a government and Rockies LNG.

Nisga’a First Nation co-owns the PRGT pipeline with Western LNG after ownership was transferred from TC Energy in 2024.

Get the latest climate news and analysis, direct to your inbox.

Subscribe Today

View our latest digests

But Ksi Lisims—which is undergoing environmental assessments and seeking regulatory approvals ahead of a final investment decision—faces basic structural hurdles, including challenges to the gas pipeline it depends on. Last November, Gitanyow Hereditary Chiefs declared plans for an Indigenous Protected and Conserved Area (IPCA) to block the PGRT pipeline’s route over environmental concerns. The pipeline also crosses rugged terrain and sensitive marine areas, adding engineering and regulatory hurdles, says IEEFA.

Challenges like these significantly affect Ksi Lisims’ financial prospects, suggests IEEFA’s analysis.

The project’s dependence on the PRGT pipeline for feed gas is a key risk, the report states. B.C. has just recently confirmed that the pipeline permit is viable after it expired last November, but some First Nations have legally challenged it, alleging inadequate consultation and environmental review. Protests led by the Gitananyow Hereditary Chiefs could add costs, as with past megaprojects like the Coastal GasLink pipeline, writes IEEFA.

Ksi Lisims’ developers say they will reduce emissions by powering the facility with renewable hydropower from the B.C. grid, and are targeting net-zero operations. But IEEFA cites uncertainty about securing BC Hydro’s electricity supply as another layer of risk, imperilling the facility’s net-zero ambitions and thus its regulatory compliance.

“Without hydroelectricity, Ksi Lisims LNG will have to rely on gas-powered turbines which increase project capital costs by approximately C$2 billion,” adds IEEFA. The project partners have yet to finalize an agreement with BC Hydro to connect the facility to the North Coast Transmission Line. Meanwhile, other upcoming LNG projects in the province are competing for the same grid capacity.

Net revenue is also questionable given the lack of LNG takers, IEEFA writes, estimating that about 70% of planned production has no dedicated buyer. The twin floating LNG barges planned for the terminal face higher operating costs in harsh marine environments, are largely “unproven in Canadian waters,”  and will provide few local jobs.

And by the time Ksi Lisims would start supplying LNG—its targeted completion date is in 2029—many similar projects are due to come online across the world, creating a global glut, IEEFA writes.

This oversupply could align with weakening demand—as expanding clean energy capacity and tighter emissions regulations lead to structural declines in LNG use.

Evolving domestic markets could also undermine success, as competition for gas as a feedstock within Canada limits the volumes available for export.

“While project developers praise its potential economic benefits, the viability of the Ksi Lisims project depends on its ability to overcome cost pressures, secure firm purchase commitments, and navigate a highly competitive global LNG market amid uncertainties about demand trends,” writes IEEFA.

“At this point, both the project and Canada’s broader LNG ambitions remain vulnerable to formidable headwinds.”







in Energy Politics, Finance & Investment, Fracking & LNG, Heat & Power, Indigenous Rights & Reconciliation, Legal & Regulatory, Power Grids

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

I agree to the Terms & Conditions and Privacy Policy.

Related Articles

Local Economies Pushed Aside as Newfoundland LNG Megaproject Presses Ahead

Local Economies Pushed Aside as Newfoundland LNG Megaproject Presses Ahead

February 6, 2026
Fermeuse LNG Receives Boost in MOU with South Korea’s Hanwha Industrial Conglomerate

Fermeuse LNG Receives Boost in MOU with South Korea’s Hanwha Industrial Conglomerate

January 29, 2026
LNG Glut Hits on Schedule as Shell, Mitsubishi Try to Withdraw from B.C. Megaproject

LNG Glut Hits on Schedule as Shell, Mitsubishi Try to Withdraw from B.C. Megaproject

January 19, 2026

Trending Stories

Alberta Premier Danielle Smith and Minister of Technology and Innovation Nate Glubish introduced, at a news conference in Edmonton on December 4, 2024, the province’s new data strategy. (photography by Chris Schwarz/Government of Alberta)

Smith Tells Albertans to ‘Lock In’ Power Prices Before Meta Data Centre Joins Grid

September 1, 2026
42.2k
Jay Phagan/flickr

West Coast Pipeline Won’t Recoup Its $43.7B Cost as Global Oil Demand Weakens

September 2, 2026
2.2k
Smoke from the Long Lake wildfires in Nova Scotia, August 24, 2025. (A Disappearing Act/flickr)

What a Supercharged El Niño Could Mean for Canada

May 18, 2026
2.3k

A Stirring Call to Apathy

by Mitchell Beer
September 6, 2026

…

Follow Us

Copyright 2026 © Energy Mix Productions Inc. All rights reserved.

  • About
  • Contact
  • Privacy Policy and Copyright
  • Cookie Policy
No Result
View All Result
  • Topics
    • Buildings & Infrastructure
    • Climate Equity & Justice
      • Energy Poverty
      • Indigenous Rights & Reconciliation
    • Climate Finance
      • Community Climate Finance
      • Finance & Investment
      • Insurance & Liability
      • Subsidies
    • Climate Impacts & Adaptation
      • Biodiversity & Habitat
      • Drought & Wildfires
      • Forests & Deforestation
      • Health & Safety
      • Heat & Temperature
      • Ice Loss & Sea Level Rise
      • Severe Storms & Flooding
    • Emissions
      • Carbon Levels & Measurement
      • CCS & Negative Emissions
      • Methane
    • Energy
      • Renewables
      • Fossil Fuels
      • Hydrogen
      • Nuclear
      • Batteries & Storage
      • Energy Efficiency
      • Power Grids
    • Food & Agriculture
    • Industry
      • Data Centres & Tech
      • Critical Minerals & Mining
      • Petrochemicals & Plastics
    • Policy & Politics
      • Carbon Pricing
      • COP Conferences
      • Elections
      • Energy Politics
      • International Security & War
      • Legal & Regulatory
    • Research & Innovation
      • International Agencies & Studies
      • Research & Development
    • Society & Culture
      • Climate Action
      • Mis/Disinformation & Greenwashing
      • Jobs & Training
      • Leisure & Recreation
      • Media, Messaging, & Public Opinion
    • Transportation & Mobility
      • Electric Vehicles
      • Shipping & Aviation
      • Transit
      • Walking, Biking & Micromobility
  • Regions
    • Africa
    • Arctic & Antarctica
    • Asia
    • Australia
    • Canada
    • International
    • Mexico & the Caribbean
    • Middle East
    • Oceans
    • Small Island States
    • South & Central America
    • Subnational
    • United States
    • UK & Europe
  • Special Coverage
    • The Weekender
    • IEA2026
    • Canada’s Major Projects Office
    • Hidden Wonder Valley
    • COP30
    • Cities & Communities
    • Heat & Power
    • Community Climate Finance
  • More Resources
    • Climate Glossary
    • What If We Changed the Conversation on Climate Change?
    • Eco-Anxiety
  • About
  • Contact

Copyright 2025 © Smarter Shift Inc. and Energy Mix Productions Inc. All rights reserved.

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}
No Result
View All Result
  • Topics
    • Buildings & Infrastructure
    • Climate Equity & Justice
      • Energy Poverty
      • Indigenous Rights & Reconciliation
    • Climate Finance
      • Community Climate Finance
      • Finance & Investment
      • Insurance & Liability
      • Subsidies
    • Climate Impacts & Adaptation
      • Biodiversity & Habitat
      • Drought & Wildfires
      • Forests & Deforestation
      • Health & Safety
      • Heat & Temperature
      • Ice Loss & Sea Level Rise
      • Severe Storms & Flooding
    • Emissions
      • Carbon Levels & Measurement
      • CCS & Negative Emissions
      • Methane
    • Energy
      • Renewables
      • Fossil Fuels
      • Hydrogen
      • Nuclear
      • Batteries & Storage
      • Energy Efficiency
      • Power Grids
    • Food & Agriculture
    • Industry
      • Data Centres & Tech
      • Critical Minerals & Mining
      • Petrochemicals & Plastics
    • Policy & Politics
      • Carbon Pricing
      • COP Conferences
      • Elections
      • Energy Politics
      • International Security & War
      • Legal & Regulatory
    • Research & Innovation
      • International Agencies & Studies
      • Research & Development
    • Society & Culture
      • Climate Action
      • Mis/Disinformation & Greenwashing
      • Jobs & Training
      • Leisure & Recreation
      • Media, Messaging, & Public Opinion
    • Transportation & Mobility
      • Electric Vehicles
      • Shipping & Aviation
      • Transit
      • Walking, Biking & Micromobility
  • Regions
    • Africa
    • Arctic & Antarctica
    • Asia
    • Australia
    • Canada
    • International
    • Mexico & the Caribbean
    • Middle East
    • Oceans
    • Small Island States
    • South & Central America
    • Subnational
    • United States
    • UK & Europe
  • Special Coverage
    • The Weekender
    • IEA2026
    • Canada’s Major Projects Office
    • Hidden Wonder Valley
    • COP30
    • Cities & Communities
    • Heat & Power
    • Community Climate Finance
  • More Resources
    • Climate Glossary
    • What If We Changed the Conversation on Climate Change?
    • Eco-Anxiety
  • About
  • Contact

Copyright 2025 © Smarter Shift Inc. and Energy Mix Productions Inc. All rights reserved.