A new report from Environmental Defence Canada challenges Ontario’s highway-heavy approach to congestion, arguing that projects such as the proposed Highway 413 will cost billions but do little to ease traffic in the Greater Toronto and Hamilton Area (GTHA).
It concludes that transit could move more than twice as many people and better align with climate goals.
The report, Transit Over Traffic: Hard Truths for Addressing Gridlock in the GTA, says expanding highways does not solve congestion in the long term but rather encourages more people to drive more, a phenomenon known as induced demand. According to Environmental Defence, this pattern has already played out on Highway 401, where additional lanes have failed to prevent worsening congestion. The cost of gridlock itself already burdens the region’s economy to the tune of about C$45 billion annually.
Yet, the province continues to prioritize road construction. The report estimates that Ontario is planning or considering highway projects worth approximately $80 billion, including Highway 413, the Bradford Bypass, and a proposed tunnel beneath Highway 401. The advocacy group argues these investments will lock the region into car dependency while offering minimal relief to commuters.
The report also links transportation policy to land use planning, stating that continued highway expansion fuels urban sprawl by encouraging low-density development in the region’s outskirts. This increases infrastructure costs for municipalities and makes frequent, reliable transit harder to deliver.
In contrast, public transit is a more effective and efficient solution, Environmental Defence says. But many transit projects in the GTHA remain underfunded or delayed, while transit service levels have declined due to reduced operating support. At the same time, policies such as the removal of tolls on Highway 407 East and cuts to gasoline taxes have lowered the cost of driving, which even further discourages transit use.
To address congestion more effectively, the report recommends halting new highway expansions, redirecting funding toward transit construction and operations, and prioritizing compact, transit-oriented development. It also calls on Ontario to reconsider policies that subsidize driving, and suggests better use of existing highways through traffic management and pricing tools.
The funds earmarked for Highway 413 alone could instead be used to build an extensive network of GO Transit rail expansions, light rail transit, and improving bus time and transit routes, suggests the report. A suite of unfunded transit projects—including GO rail regional transit expansions, light rail transit (LRT), and bus rapid transit (BRT) in Vaughan, Brampton, Mississauga, and beyond—could move 17,300 people per hour per direction, more than double the carrying capacity of Highway 413.
These alternatives would also reduce greenhouse gas emissions, supporting provincial climate commitments. The report itself does not model specific emissions figures, but another analysis by Environmental Defence shows that by 2050, Highway 413 could add over 700,000 tonnes of greenhouse gas emissions to Ontario’s roads each year.
The more recent report frames congestion in the GTHA as a policy choice rather than an inevitability. Without a shift away from highway expansion and toward transit investment, it warns, gridlock in the GTHA will continue to worsen, despite the billions spent on new roads.












